
We are pleased to
present the latest edition of the Extrusion Press Maintenance Manual.
The new 416-page manual is designed to assist plant engineers and maintenance managers, especially in cases where
experienced maintenance people have retired or original manuals have been lost. It will be valuable for training new
workers, for documenting procedures for ISO 9000 certification, and as general information for extrusion companies' upper
management. This unique manual, which documents in detail all
aspects of extrusion press maintenance, was prepared by drawing on my 30 years of experience in the extrusion industry,
and on published references. In addition, selected presentations by industry experts on several critical topics, such
as electrical and hydraulic system maintenance and repair of major components, have been incorporated in the manual with permission
of the authors. The loose-leaf manual contains some 317 illustrations
plus tables, charts, and useful references, as well as Preventive Maintenance Schedules in spreadsheet format, to permit the
user to customize the schedules for individual requirements.
To order the manual online please go to
the Home page above !! If you require immediate delivery, the complete manual is available in Adobe pdf format
by large file transfer (24 Mb) for $100 USD.
|
|
USD$100 - Manual by electronic transfer - *.pdf format (large file transfer). PLEASE INCLUDE E-MAIL ADDRESS. |
click here to DOWNLOAD A SAMPLE of Chapter 3 - Tooling
Table of Contents for the Extrusion Press Maintenance Manual: Introduction - Acknowledgments
- References
- Useful
Tables:
- Conversion of Units
- Temperature Conversion
- Calculating Stretcher Capacity - English Units
- Calculating
Stretcher Capacity - Metric Units
- Weight of Extrusion Billets
- Press Specific Pressure - English Units
- Press
Specific Pressure - Metric Units
- Millimeter Conversion
- Time Limits for Tooling in Oven at Temperature
- Thermocouple
Types
- Glossary of Terms for Press Components
- Diagrams of Press Components
Routine Inspection
and Maintenance - Scheduled Maintenance
- Mechanical Maintenance
- Lubrication
- "Preventive
Maintenance Program Recommendations" (The Voice of Experience), by David Turnipseed
- Daily Check Sheet Procedure
- Daily
Check Sheet (Sample)
- Press Troubleshooting Chart
- "Extrusion Press Maintenance - A Predictive Approach"
(The Voice of Experience) by P. Gopalan Kutty, Gulf trusions, Dubai
- Farrel Maintenance Training Course information:
- Press
Installation
- Mechanical Functions of an Extrusion Press
- Mechanical Maintenance
Press Alignment - Alignment
Procedures
- Recommended Tools
- Alignment and Leveling of the Fixed Press Components
- Alignment of the
Moving Press Components
- Use of the Alignment Tool Stack
- Quick Checks of Press Alignment
- Modifying
the Press for Easier Adjustment of Alignment
- "Extrusion Press Alignment with Modern Technology,"
by J.E.V. Mulder and G.J. Smith, University of Otago, New Zealand
Tooling - Fixed Dummy
Blocks
- Loose Dummy Blocks
- Clean-out Blocks
- Stem
- Container
- Container Liner
- "Extrusion
Container Care and Maintenance," by James M. Pope, Special Projects Consultant to Lake Park Tool
- Improvements
to Container Design
- "Preventive Maintenance of Extrusion Tooling," by Gary Dion, Extrusion Consultant
Minimizing the Occurrence of Flared Billets
- "Lubrication of Extrusion Press Tooling" by James Dyla,
Amcol Corp.
Inspecting and Repairing Major Components - Procedure for Repairing Cracked
Main Cylinder
- How Major Components are Designed and Tested
- "Adapting Extrusion Presses for a High
Cycle Fatigue Load Environment," by J.O. Nøkleby, Det Norske Veritas
- In-Service Inspection, Repair,
and Trouble-Shooting
- Failed Components - Repair or Replace?
- Requirements for Replacement Components
- "Catastrophic
Failure: A 48 Hour Remedy," by Rick Colden and Adam Cramlet, Alexandria Extrusion
Hydraulic
Equipment - Hydraulic Oil
- Filtration
- Temperature
- Sampling & Analysis
- Air
Breather
- Pumps
- Valves
- Piping
- Pressure Gauges
- System Documentation
- Troubleshooting
- "Proper
System Maintenance to Avoid Contamination and Cavitation," by Jack Hayes, Oilgear
- Farrel Maintenance Training
Course information:
- Hydraulic Maintenance
- Right and Wrong Ways to Install Hydraulic Tubing and Fittings
- Troubleshooting
Hydraulic Problems
- Glossary of Hydraulic Terms
- ISO/CETOP Hydraulic Symbols
- Oilgear Training Bulletins:
- Hydraulic
System Survival Techniques #90012
- Filtration Recommendations #90007-D
- Piping Information #90011-F
- Resistance
of Valves and Fittings to Flow of Fluids
- Storage Recommendations #90006B
Electrical & Controls - Maintenance
of Control Equipment
- Container Heating
- Electric Motors
- "Extrusion Press Electrical Systems,"
by David Turnipseed
- "Tips for Successful Electrical Trouble Shooting of Extrusion Equipment,"
by David Turnipseed
Billet & Log Infeed Systems - Billet/Log Infeed Conveyors
- Billet/Log
Heaters - Gas Fired
- Refractory and Insulation
- Thermocouple Probes
- Combustion Systems
- Billet
Heaters - Induction
- Log Shear
- Log Saw
- Billet Transfer Conveyor
- Billet Lubrication
Profile
Handling Systems - High Temperature Textile Materials
- Lead-out Tables
- Run-Out Conveyors
- Water
Quench Systems
- Air Quench Systems
- Saws and Shears for Hot Profile Cut-Off
- Pullers
- Profile
Transfer Systems and Lift-Overs
- Cooling Tables:
- Walking Beams
- Belt Conveyors
- Stretchers
- Saw
Feed Conveyors
- Finish or Cold Saws
- Saw Blade Lubrication
- Saw Length Gauges
- Off-Load Conveyors
- Profile
Stackers
Age Ovens - Temperature Surveys
- Basic Age Oven Configurations
- Combustion
Systems
- Routine Combustion System Maintenance
- Improving Age Oven Energy Efficiency
Die
Ovens Maintenance Schedules - When to Perform Extrusion Plant Maintenance
- Master
Maintenance Schedule
- Daily Maintenance
- Weekly Maintenance
- Monthly Maintenance
- Quarterly Maintenance
- Six
Months Maintenance
- Annual Maintenance
Spare Parts - Recommended Spare Parts
- Storage
of Spare Parts
Modernizing Older Presses - Specifying a New Press
- Modernizing
the Press Feed Line
- Modernizing the Handling System
- Downstream Material Handling
- Auxiliary Equipment
- Vendor
Request form for Press Upgrades
- "The Extrusion Press Line for 2024: A Forecast," by Al Kennedy
- Double-Length
Run-out Systems
Safety & Environment - Extrusion Tooling Safety
- Safe Lifting
Techniques
- Mechanical Press Equipment
- Keeping Overhead Cranes Safe
- Check List of Safety Hazards
- Personal
Protective Equipment
- Lock-Out Tag-out Procedures
- Environment
Managing Extrusion Plant
Maintenance - The Maintenance Level Audit
- Staffing and Required Skills
- Maintenance Engineering
- Equipment
Information Files and History
- Spare Parts Inventory
- "Ten High-Tech Tools for Extrusion Plant Maintenance,"
by Al Kennedy
Manual Sponsors - Albarrie
- Amcol
- Belco
- Butech
- BWF
Tech
- COMPES
- Castool
- Dunaway, Inc.
- Granco Clark
- Kennedy Eurotech, Inc.
- Lake
Park Tool
- Marathon Belting
- Oilgear
- OMAV
- R.L. Best
Prices: Book version:
$275 US, CD and surface shipping included (add $40 for air mail, recommended for orders outside the US) CD-ROM version
only: $145 US, shipping included (add $5 for air mail, recommended for orders outside the US) To
order the manual online, click on the Home page above !! The manual may also be ordered from: Aluminum Extruders Council - 1000 N. Rand Road, Suite 214 - Wauconda IL 60084 USA Tel: 847-526-2010
- Fax: 847-526-3993 mail@AEC.org http://www.aec.org/ Send your mailing address and full payment to above address. Checks must be in US funds, drawn on a US bank, net
of any collection fees. International Money Orders accepted. VISA and MasterCard Accepted - call
or fax for information.
|
|
|